HIQA performs inspections during active construction. Fax: 718-556-7305, The Bronx (212) 839-2410 WORK FROM 7 PM FRIDAY THROUGH 6 AM MONDAY. WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE. (718) 391-1958 Incorrect Information on File If a permittees 24/7 phone number, address or other contact information is inaccurate or has changed without being updated, all future permit requests may be placed on hold until the information is updated. Tel: 718-286-3170 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. YOU MUST SURVEY THE SITE. New York, NY 10038 (5mb). CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. The Glossary and definitions found in this Manual provide a brief explanation of NYC DOT terminology. A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). 40 Worth Street 8th Floor The installation and repair of this infrastructure is crucial to maintaining and strengthening the city's competitive position in the global economy. ALL SIDEWALKS IN C4-4 THROUGH C4-7, C5 & C6 COMMERCIAL DISTRICTS, AS DEFINED IN THE NYC ZONING RESOLUTION SHALL BE OF PIGMENTED CONCRETE WITH SAW-CUT JOINTS AS SET FORTH IN SEC. Check each borough in which the applicant expects to work. Applicant Information (Corporation, LLC or LLP), 1C. RESTORE ALL TRAVEL LANES TO TRAFFIC. Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 619 Work Zone Traffic Control 619 SHEETS EFFECTIVE BEFORE LETTING OF MAY 1, 2022 ARE AVAILABLE IN THE TABLES BELOW Notes: 1. Queens Five types are relevant to the citys street lights: I, II, III, IV, and V. Standard Street Light: Standard pole (Octagonal) with LED Cobra Head luminaire. All construction-related permits have expiration dates. Fax: 212-720-3488, Queens For hearings, Monday to Friday from 8:30 AM to 3:30 PM. Further information is available in Section 2-02 (h) of the Highway Rules. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. See Section 3.5.1 Holds for more information. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. NYC DOT's HIQA unit inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. Download a PDF of the Lighting chapter for offline access to the content in this section. Signs must be conspicuously displayed and face the nearest curb line. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. Street excavations also adversely affect the condition of the streets, reducing the number of years the pavement would otherwise be expected to remain in good or excellent condition following resurfacing or reconstruction, and increasing repair and life cycle costs for the city. FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. SEND RESPONSES TO NYCDOT DIV. If all information is satisfactory, EAU will fax or call the applicant with an EAN, which must be available at the work site and presented to any governmental employee upon request. The notice provisions specified in Section 2-02(g) of the Highway Rules are the minimum required for street operations. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. CONNECT WITH US. MAINTAIN 2 LANES NORTHBOUND AND 1 LANE SOUTHBOUND FROM 4PM-6PM M-F. A HIQA inspector must be present during the restoration. Workers pour cement during sidewalk reconstruction. NYC DOT may revoke or refuse to renew a permit for any of the reasons listed below. SUPERINTENDENT OF HIGHWAY OPERATIONS (ASHO) OFFICE & OCMC-STREETS IN WRITING NO LATER THAN 48-HOURS PRIOR TO COMPLETION OF PAVING. NJDOT Engineering Department of Transportation Engineering The Engineering area contains most of the reference material needed to design and construct a Capital Program project. Sub title REVISED DRAWINGS COVERING PEDESTRIAN RAMPS Agency Design and Construction, Department of (DDC) Additional creators DDC & DOT Subject Traffic Safety Transportation Streets and Highways Report type Connecticut Department of Transportation FULL INTERSECTION RESTORATION WILL BE REQUIRED. View more information on how to respond to Sidewalk Violations. 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. Executive (EXC) hold An EXC hold is automatically placed if the proposed permit locations involve locations deemed necessary by NYC DOT. Canopy permits are generally taken out by building owners, business owners, and canopy installers. serviceInformation on long-term capital programs from potential street excavators helps NYC DOT to effectively coordinate planned street work. Unauthorized removal of muni-meters is prohibited. AS COORDINATED WITH COMMUNITY BOARD, CON ED. Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. A single PDF of the 619 Standard Sheets is available at the . See the Highway Rules, Section 2-02(l). Tel: 718-220-8500 120-55 Queens Boulevard, 1st floor, Room 1-240 WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. Permit Bond. Street excavations must be performed in accordance with Section 2-11 (e) of the Highway Rules. Office hours: 8:30 AM-5:00 PM, Queens An EAN is required for each utility access cover opening at a location, provided that the work is performed around the clock until the emergency is eliminated, at which time the EAN expires. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. SPECIFICATIONS. The applicant will be able to pick up the permit from the Permit Office in the borough in which the canopy is located upon payment of the appropriate fee. NYCStreets system will automatically block an applicant from submission if insurance is not current. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The purpose of placing a street in protected status is to maintain the integrity of a new street surface. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. ONE LANE MAY REMAIN CLOSED, FOR CONCRETE CURING ONLY, FOR A MAXIMUM OF 48 CONSECUTIVE HOURS MONDAY TO FRIDAY IF WEEKDAY WORK HOURS ARE GRANTED, OR FROM 12:01AM SATURDAY THROUGH 6AM MONDAY IF WEEKEND OR NIGHTLY (7 NIGHTS) WORK HOURS ARE GRANTED. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. 619 Maintenance and Protection of Traffic - New York State Department The term "street" means a public street, avenue, road, alley, lane, highway, boulevard, concourse, parkway, driveway, culvert, sidewalk, crosswalk, boardwalk, viaduct, square or place, except those streets adjacent to any waterfront property designated as a marginal street on a city map. CONTRACTOR MUST NOTIFY THE ALLIANCE FOR DOWNTOWN NEW YORK 120 BROADWAY SUITE 3340 NEW YORK, NEW YORK 10271 212-566-6700, AT LEAST 3 BUSINESS DAYS PRIOR TO STARTING WORK. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR ORIGIN TO DESTINATION FOR DISTANCE OF TRENCH CURB TO CURB AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. If the proposed location may be suitable, HIQA performs an inspection in order to confirm its suitability. Permittees can use these maps to make informed decisions while planning new projects. WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A LIMITED-ACCESS ARTERIAL HIGHWAY, WRITTEN APPROVAL FROM THE NYCDOT OCMC- HIGHWAYS IS REQUIRED.WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A PUBLIC. The stipulation text on a NYC DOT permit is the official text, with which a permittee must comply. At the foundation of the city that never sleeps lays a network of streets that helps keep New York and New Yorkers moving forward. This information should be used to plan work before streets go into protected street status. Applicant should submit this form with the appropriate documentation and waiver request fee. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. A sketch showing the canopy dimensions, location and all street facilities and furniture within 15 feet of both sides of the proposed canopy. NO EQUIPMENT/MAT'L MAY BE PLACED ON TOP OF SENSORS. For New York City Department of Design and Construction (DDC) capital projects, a CPO hold can only be released by DDC. Attn: Forestry When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. NOTARIZE THE FORM. Corner TreatmentThe two slope lines meeting at the intersection of the two building lines must drop from a common point at the building corner toward their respective curbs at a rate within the limits prescribed in the Highway Rules. USE OF METERED, AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED.td>. Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. All active permits in the affected area(s) are suspended during the dates and times of the embargo period and no new permits may be approved, unless a waiver for the work is granted by OCMC. NYC Parks & Recreation New York, NY 10007-1216 AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. Applicants must submit a completed permit application. To request release of the hold, the permittee must contact HIQAs central office or one of the borough offices to update the file. NYC DOT may revoke a permit without affording the permittee an opportunity to be heard prior to the revocation if NYC DOT determines that an imminent peril to life or property exists. AUTHORIZED PARKING, DIPLOMAT PARKING, BUS STOPS & TAXI ZONES ARE RESTRICTED. Policies; Accessibility; About CT; An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. PERMITTEE SHALL NOT DISRUPT OR DAMAGE SENSORS INSTALLED WITHIN THE PARKING_LN. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR SPECIFIC TRAVEL LANE RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Standard Sheets are available both in the US Customary units accessible below and in Metric units. FULL SIDEWALK CLOSURE ALLOWED FOR SIDE WALKS LESS THAN 15 FT WIDE. NYC Parks & Recreation The CGL policy should provide coverage in the amount of no less than $1 million combined single limit per occurrence, except for applications for permits to place a crane on a street, which requires $3 million combined single limit per occurrence. Attn: Forestry Crane placed on the street for construction activity. 40 Worth Street 8th Floor The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. PHONE#508-429-6023. COORD. The applicant will be charged a fee of $30 for each utility access cover opening EAN. In order to apply for a permit, an applicant must first register in person with NYC DOT by submitting a completed Permittee Registration Application. nyc.gov/dot. Minimum slopes should be used wherever possible. Working Without a Permit If the permittee has been issued a summons/NOV for working without a permit, all future permit requests may be placed on hold until the applicant takes out a permit of record for the work that was performed. WITHIN THIS 15 FEET THE FIRST 8 FEET ADJACENT TO THE CURB IS FOR MATERIALS/EQUIPMENT, THE THE REMAINDER OF THIS 15 FEET IS FOR 5 FOOT CLEAR FOR PEDESTRIANS WITH BARRIERS NO IMPACT ON THE REMAINDER OF THE 47 FEET OF THE REAMINDER OF THE ROADWAY AT ANY TIME._ MEC-07-270. Parking Signs and Rules NYC311 - Government Of New York City These applications can be submitted online using NYCStreets. Borough Permit OfficesIn-person applications for all other construction-related work can be submitted to the borough office in the borough in which the work is to be performed. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. Tel: (646) 252-5517 or (646) 252-5544, New York State Department of Transportation (NYSDOT) All CGL insurance policies must contain the following cancellation clause: In the event of expiration or cancellation of any such policy, the company will give the Permit Office at least 30 days' written notice prior to such expiration or cancellation. (718) 391-1937 If the location is deemed suitable, HIQA signs the Canopy Authorization Form indicating HIQA approval and returns it to the applicant. FIVE OR MORE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. THIS PERMIT IS BEING ISSUED WITH UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BLOCK SEGMENT CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). Transformer vaults are typically installed, owned and maintained by an electric utility company. HIQA performs inspections during active construction through its completion and up to the end of the Guarantee Period.